Abstract:During the construction phase of a construction project, there are often a large number of engineering changes, and the supervisory department is responsible for reviewing the changes at this stage, while also synchronously carrying out corresponding cost control work. The article starts from the key points and relevant precautions of engineering change review, deeply analyzes the core causes of cost management loss control in the construction phase, and proposes corresponding control strategies in a targeted manner.